Name the approval subject
A flat swatch can establish colour and texture. A section sample can establish a proposed build-up. A first article can demonstrate geometry and workmanship. Record each decision separately rather than allowing one signed sample to stand for every requirement.
Keep open items visible
Maintain a list of dimensions, material evidence, interfaces and quantities still awaiting confirmation. A supplier may be ready to discuss a colour while the site survey remains incomplete. Do not release manufacture until the controlling information for the order is agreed.
Use a clear release instruction
Identify the approved documents and any accepted deviations. Specify whether the instruction permits sample manufacture, first-article manufacture or the full order. Keep the responsible approver and date in the record so later teams can understand the scope of consent.
| Decision | Put this in writing |
|---|---|
| Finish sample | Colour and texture reference. |
| First article | Representative geometry and workmanship. |
| Production release | Authority to make the agreed quantity. |
Put the detail to work.
A client signs a champagne sample while the final panel dimensions are still awaiting survey. Record the sample as colour approval only and keep manufacturing on the agreed release process. When dimensions are resolved, issue the complete production package. This avoids treating an early aesthetic decision as authority to make an entire order from provisional geometry.
Before you enquire
- State the scope of every approval.
- Close unresolved manufacturing information.
- Retain the approved references together.
About this procurement note
The checklists and buying example are original SSSTEEL editorial guidance. Project drawings, supplier documentation and the agreed order govern the actual supply. External references are not product endorsements or proof of SSSTEEL certification.
